48 SUB - STATIONS

EXEC. TIME MONTHS: 8

CLIENT: Bouygues

VALUES IN US$: 800,000

Supply and Installation of Plumbing for 48 Sub-Stations

ROYAL PALACE EXTION

Dammam

EXEC. TIME MONTHS: 5

CLIENT: Saudi Oger

VALUES IN USS: 2,500,000

All plumbing equipment

RAWDA PALACE

Riyadh - Saudi Arabio

EXEC. TIME MONTHS: 6

CLIENT: Prince Abdulloh Ben Abdul Aziz

VALUES IN US$: 1,250,000

Design, Supply and Installation of MVILV Distribution system and Extra Low Voltage system such as :

. MVILV Substations main and secondary distribution boards.

. MVILV Controls Cables

. Earthing and Lightning systems

• Internal and External lightings

• Security lighting

• Receptobles Contoctors Relays and other LV Equipments

DAIRY FARM PROJECT

AL-Khalis - Iraq

EXEC. TIME MONTHS: 12

CLIENT: 1978 - Pec Engeneering France

VALUES IN USS: 835,000

Design, Supply and Installation of:

Electrical, Mechanical Works and Water Treatment

SERUN & CACCINE LABORATORIES

EXEC. TIME MONTHS: 3

CLIENT: Ministry of Housing

VALUES IN US$: 300,000

Installation of Electrical Works

PALACE Of HRH MOTHER PRINCESS OF PRINCE

Sultan Ben Mohamed Ben Saud El Kabeer

EXEC. TIME MONTHS: 14

CLIENT: SACC

VALUES IN US$: 500,000

Design, supply and installation of :

. Electrical low voltage and extra low voltage equipments

. Plumbing and sanitary equipments

DIWANIYAH TIRE PLANT

EXEC. TIME MONTHS: 8

CLIENT: F.A. Kettaneh

VALUES IN US$: 870,000

Installation of Electrical and Mechanical Works

MECCA 14

Mecca - Saudi Arabia

EXEC. TIME MONTHS: 6

CLIENT: SAUDI OGER

VALUES IN USS: 2,400,000

Design, supply and installation of MVILV Distribution system and Extra Low voltage system such as :

. MVILV Substations Main and Secondary Distribution

Boards

. Earthing and Lightning systems

. External Lighting

. Telephone system

. TV Distribution system

• CCTV System

• Call attendance system

• Fire Alarm system

. Technical alarm system

• Security interphones

• Security Sound system

- Centralized Management Control System

AZIZIA ISLAND

Jeddah

EXEC. TIME MONTHS: 6

CLIENT: Saudi Oger

VALUES IN US$: 360,000

Design, supply and installation of MVIL V Distribution system and Extra Low voltage system such as :

• MVILV Substations main and secondary distribution boards

. Earthing and lighting systems

• External Lighting

INCOME TAX BUILDING

Baghdad - Iraq

EXEC. TIME MONTHS: 24

CLIENT: 1983 - Ministry Of Housing - Iraq

VALUES IN USS: 2,500,000

Design Supply and Installation of :

- Electrical Low Voltage and Extra Low Voltage Equipments

- HVAC Works and Equipments

BAGHDAD INTERNATIONAL AIRPORT DESIGN

Baghdad - IRAỌ

EXEC. TIME MONTHS: 24

CLIENT: 1981- Fougerolle France

VALUES IN US$: 3,000,000

Design, Supply and Installation of:

- Low Voltage Systems

- Fire Alarm and Control System

Winter Diwanieh & Hall 1002

-Building 1C, 1"

Riyadh

EXEC. TIME MONTHS: 4

CLIENT: Saudi Oger

VALUES IN US$: 430,000

HVAC Equipment