OMEYYADES CENTER

Damascus - Syria

Hotels

EXEC. TIME MONTHS: 9

CLIENT: Oger Liban

VALUES IN USS: 1,500,000

Installation of HVAC and plumbing equipments

Design, Supply and Installation of :

• Security Sound System

• Security Interphones

• Fire Alarm system

• Centralized Management Control System

. External Lighting Fitting

MODIFICATIONS IN PETROLA

Jeddah

EXEC. TIME MONTHS: 9

CLIENT: Saudi Oger

VALUES IN USS: 3,000,000

Design, supply and installation of MVILV Distribution system such as

. High voltage Switch gear

. MVILV Substations Main and Secondary Distribution boards

. Earthing and Lightning System

. Busbar Duct

• Cables

• Normal and Emergency Lighting fitting

AL SALEM PALACE - MODIFICATIONS

Jeddah

EXEC. TIME MONTHS: 12

CLIENT: Saudi Oger

VALUES IN USS: 1,800,000

Design, supply and installation of MVILV Distribution system and Extra Low Voltage system such as :

. MVILV Substations Main and Secondary Distribution boards

. MVILV and Control Cables

. Earthing and lightning systems

. External lighting

• Telephone system

• TV Distribution System

• Call Attendance system

• Fire Alarm system

- Technical Alarm system

• Security Sound system

TECHNICAL BUILDINGS AND EXTERNAL NETWORKS

EXEC. TIME MONTHS: 9

CLIENT: Oger Liban

VALUES IN USS: 1,440,000

Supply and Installation of HVAC Equipments

PROTEIN PLANT

EXEC. TIME MONTHS: 2 CLIENT: Animal Production

VALUES IN US$: 210,000

Installation of Electrical Works

KING KHALID INT. AIRPORT HOTEL

Riyadh - Saudi Arabia

EXEC. TIME MONTHS: 6

CLIENT: Saudi Oger

VALUES IN US$: 1,400,000

Design, supply and installation of :

. Telephone system

. TV Distribution system

- Mosque Sound System

• Security Sound System . Music Sound System

. Clock system

. Call attendance system

. CCTV System

• Fire Alarm system

. Gas detection system

. Building automation system

LIGHTING OF CEMENT BLOCK- AL KHAL

EXEC. TIME MONTHS: 4

CLIENT: Ministry of Industry

VALUES IN US$: 420,000

Installation of Electrical and Mechanical Works

TAIBA PALACE

Medina

EXEC. TIME MONTHS: 12

CLIENT: SAUDI OGER

VALUES IN US$: 2,800,000

Design, Supply and Installation of MVILV Distribution system and Extra Low Voltage system such as :

. MVILV Substations main and secondary distribution boards.

. MVILV Controls Cables

. Earthing and Lightning systems

• Internal and External lightings

. Security lighting

• Receptables Contactors Relays and other LV Equipments

KHOZAM FARM

Riyadh

EXEC. TIME MONTHS: 6

CLIENT: Saudi Oger

VALUES IN US$: 1,310,000

Design, supply and installation of LV Distribution system such as :

- High voltage Switch gear

• LV Substations, Main and Secondary Distribution boards

- Earthing and Lightning systems

. Cables

. Normal and Emergency Lighting fitting

- External lighting

IRAQ NATIONAL STUDENT FEDERATION BUILDING

EXEC. TIME MONTHS: 7

CLIENT: Ministry of Industry

VALUES IN US$: 750,000

Installation of Electrical Works

BANI SAAD ACADEMY INSTITUTION PROJECT

EXEC. TIME MONTHS: 3 CLIENT: Ministry of Industry VALUES IN USS: 250,000 Installation of Electrical Works

AL SALAM PALACE - SUPPORTING BUILDING

Jeddoh - Saudi Arabio

EXEC. TIME MONTHS: 9

CLIENT: Saudi Oger

VALUES IN US$: 1,300,000

Design, supply and installation of LV Distribution system such as :

. High voltage Switch gear

. LV Substations Main and Secondary Distribution boards

• Earthing and Lightning systems

• Cables

• Normal and Emergency Lighting fitting