HOLIDAY INN - MARTINEZ

EXEC. TIME MONTHS: 8

CLIENT: 1998 - UCE Karam Group

VALUES IN USS: 3,600,000

Electro-Mechanical Works

Supply & Installation of Electrical, Plumbing & HVAC works

ROYAL PROTOCOL

Riyadh

EXEC. TIME MONTHS: 14

CLIENT: Royal Protocol Of K.S.A.

VALUES IN USS: 4,000,000

HVAC Equipment

North Project - Sharma Royal Complex - Phase 2

NEOM (Sharma) - Kingdom of Saudi Arabia

Year 2023 (January to September)

Royal Zones, Infrastructure & External Areas, MV/LV

Substations

Project Value: 32,000,000 SAR

Consultant : DAR

Client: Modern Architecture Contracting Company (MACC)

Scope: Design, Supply, Installation, and Testing &

Commissioning

. MV/LV Substations

• Earthing & Lightning Protection Systems

. Power Systems

- Normal & Emergency Lighting

• LUTRON Lighting Control Dimming System

• Uninterruptable Power Supply System (UPS)

• External & Façade Lighting

. Distribution Boards and Final Panel Boards . External F.O Infrastructure Cabling Network

NEW BUILDING KOURAITEM

Beirut

EXEC. TIME MONTHS: 12

CLIENT: 1997 - Oger Liban

VALUES IN US$: 3,200,000

Design, Supply and Installation of :

- Power Plant

- MVILV Distribution System and Extra

- MVILV Substations Main and Secondary Distibution Boards

- LV Substations, Main and Secondary

DISTRIBUTION BOARDS:

- Earthing and Lightning System.

- Low Current Systems( Fire Florm, Sound, PABX ,Public Address & CCTV)

- normal and Emergency Lighting fittings

- External lighting

BALAD

Baghdad - Iraq

EXEC. TIME MONTHS: 6

CLIENT: Ministry Of Defence

Supply and Installation of 7 Stations 7x85 M

Water Treatment Plant

AL SALAM ROYAL PALACE

Jeddah, Saudi Arabia

Main Villa 02 and External Areas

Year: 2021

EXEC. TIME: 4 Months

Consultant: DAR

Client: Modern Architecture Contracting Company (MACC)

Electrical: High Current Systems

Design, Supply, Installation, and final Commissioning

. Earthing/Bonding and Lightning Protection

. Distribution Boards and Panel Boards

• Power Systems and Equipment . Normal & Emergency Lighting

. Lighting Control Systems (LUTRON System)

. Uninterruptable Power Supply (UPS)

• Façade & External Lighting

• Structured Cabling Network

COLLEGE HALL BUILDING-AMERICAN UNIVERSITY OF BEIRUT

 Normal and Emergency Lighting fittings


EXEC. TIME MONTHS: 24


CLIENT: 1995 - Karagulla


VALUES IN US$: 1,717,000


Design, Supply & Installation of :


College Hall Building


Medium Voltage Substation LV Distribution

System



- MVILV Substations Main and


Secondary Distibution Boards


- LV Substations, Main and Secondary


DISTRIBUTION BOARDS:


- Earthing and Lightning System.


- Low Current Systems

• Fire Alarm System



•Public Address System

•Security System


• Audio System


•Telephone & Data

ARMED FORCES

EXEC. TIME MONTHS: 18

CLIENT: Ministry Of Defence & Armed Forces

VALUES IN USS: 3,750,000

Design, supply and installation of MVILV Distribution system such as :

. High voltage Switch gear

• Diesel GENSET

. MVILV Substations Main and Seconday Distribution

Boards

. Auditorium Lighting

. Earthing and Lightning systems

• External Lighting

• Cables

. Normal and Emergency Lighting fitting

• Telephone system

• MATV system

Armed Forces (continue)

• Public address system

. Fire Alarm system

- Auditorium Sound system

• Audio-Visual system

- Cinema Projection system

AL SALAM ROYAL PALACE

Jeddah, Saudi Arabia

Main Villa 02 (Royal Offices)

Year 2020

EXEC. TIME MONTHS: 4

Consultant: SAUDI DIYAR

Client: Modern Architecture Contracting Company(MACC)

Electrical: High Current Systems & Low Current Systems Design, Supply, Installation, and Final Commissioning

• Earthing/Bonding and Lightning Protection

. Distribution Boards and Panel Boards

• Power Systems and Protections

• Normal & Emergency Lighting

• Lighting Control Systems (LUTRON System)

• Uninterruptable Power Supply (UPS)

CHARLES HOSTLER STUDENT CENTER

AMERICAN UNIVERSITY OF BEIRUT

EXEC. TIME MONTHS: 10 CLIENT: 2006 - Karagulla VALUES IN US$: 1,750,000 Supply & Installation of All Electrical Works, and audiovisual systems

Khor Al Zubair

Basrah - Irag

EXEC. TIME MONTHS: 3

CLIENT: Creusot Loire

Supply and Installation of 25 MoH

Water Treatment Plant

AL YAMAMA ROYAL PALACE

Riyadh, Saudi Arabia

Main Villa 01 (Basements), Ancillary Buildings, External Areas

Year 2019 & 2020

EXEC. TIME MONTHS: 5

Consultant: SAUDI DIYAR

Client: Modern Architecture Contracting Company (MACC)

Electrical High Current Systems & Low Current Systems Design, Supply, Installation, and final Commissioning

. Earthing/Banding and Lightning Protection

• Distribution Boards and Panel Boards . Power Systems & Equipment

• Normal & Emergency Lighting

. External Lighting

. Structured Cabling Netwark (UTP & Fiber Optic Cables)

. Data and ICT Systems (Active & Passive)

. External Infrastructure Fiber Optic & UTP Cabling

. Outdoor WIFI System

. Configurations and Testing of Wireless Systems &

Coverages

. Security Systems