460 Housings
EXEC. TIME MONTHS: 15
CLIENT: Bouygues
VALUES IN US$: 5,320,000
Design, Supply and Installation of Plumbing and Sanitary Equipments
Jeddah - Saudi Arabia
EXEC. TIME MONTHS: 12
CLIENT: Saudi Oger
VALUES IN US$: 4,800,000
Design, supply and installation of:
• MVILV substations
• LV main and secondary distribution boards
- MViLV and Control cables
• Earthing and lightning systems
- External lighting
Family Diwan
TAIF
EXEC. TIME MONTHS: 7
CLIENT: SAUDI OGER
VALUES IN USS: 2,400,000
Main Villa
All plumbing and sanitary equipments
Baghdad - IRAQ
EXEC. TIME MONTHS: 18
CLIENT: Bouygues
VALUES IN US$: 5,400,000
Design, Supply and Installation of Electrical
- Electrical Low Voltage and Extra
Low Voltage Equipments
Supply and Installation of Plumbing and
Sanitary Equipments
Supply and Installation of HVAC Equipments
Al Kazimia
CLIENT: Faculty of MedicineMinistry Of Housing
Installation of 11KVA substation
Water Treatment Plant
EXEC. TIME MONTHS: 6
CLIENT: Rashid Engineering
VALUES IN USS: 2,200,000
Design, supply and installation of MVILV Distribution system and Extra Low Voltage system such as :
• MVILV Substations Main and Secondary Distribution boards
• Earthing and lightning systems
. External lighting
• Telephone system
. TV Distribution System
• CCTV System
• Call Attendance system
. Fire Alarm system
• Technical Alarm system
• Security Sound system
• Centralized Management Control system
. LV Substations Main and Secondary Distribution boards . Earthing and lightning systems
. Cables
• Normal and Emergency Lighting fitting
• External lighting
EXEC. TIME MONTHS: 4
CLIENT: Ministry of Industry
VALUES IN USS: 350,000
Installation of Electrical Works
Riyadh - Saudi Arabia
EXEC. TIME MONTHS: 18
CLIENT: ISSA EST.
VALUES IN US$: 4,700,000
Design, supply and installation of.
. HVAC Equipments
. Electrical low voltage and Extra low equipments
Riyadh
EXEC. TIME MONTHS: 12
CLIENT: Saudi Oger
Plumbing Equipment
EXEC. TIME MONTHS: 5
CLIENT: Military Works
VALUES IN USS: 450,000
Installation of Electrical Works
Al Kazimia
CLIENT: Faculty Of Law Ministry Of Housing
Installation of 11KVA substation
Water Treatment Plont
Execution Time: From 1997 To 2001
Consultant: SAUDI DIYAR
Client: SAUDI OGER Ltd
Values in US S: 15 000 000
Electrical - High and Low Current Systems :
Design, Supply, Installation and final commissioning of all Electrical Systems
• Fire Detection
• CCTV Systems
• LV / MV Substation and Cabling
• Earthing/Bonding and Lightning Protection
• Distribution Boards and Switchboards
• Normal & Emergency Lighting
• Power Systems and Protections
• Medical Equipment Power & Earthing Systems
• Uninterruptable Power Supply (UPS)
• Façade & External Lighting