AI BAHA GENERAL HOSPITAL

Al Baha

EXEC. TIME MONTHS: 12

CLIENT: Saudi Oger

VALUES IN USS: 11,000,000

Electro-Mechanical Works

Supply & installation of all Electrical, Plumbing & HVAC works

High Currents

- Power Plant Generating Sets

- MVILV Substations, Main and Secondary Distribution Boards

- Lightning, emergency lighting and all other services

- All special equipment for rooms and general medicol services

- Electrical supply and protections for medical equipment Low

Currents

- All Security and low current systems for the hospital Mechanical

- All plumbing, HVAC and AC works

KAUST-KING ABDULLAH UNIVERSITY OF SCIENCE AND TECHNOLOGY

BUILDING 6&9, EXTERNAL WORKS EXEC. TIME MONTHS: 13

CLIENT: Saudi Oger

VALUES IN US$: 58,000,000

Electro-Mechanical Works

sumbing e fill fighting dectrical,

High Currents

- MV Network

- MVILV Substations, Main and Secondary Distribution Boards

- Lightning, emergency lighting and all other services

- outdoor Lighting

Electrical supply and protections

Low Currents

- All Security and low current systems for the university

- Audiovisual systems for 90 classrooms

- Fibre optics networks

Mechanical

- All plumbing and fire fighting

YAMAMA PALACE (YAMAMA 8)

Riyadh

EXEC. TIME MONTHS: 9

CLIENT: Saudi Oger

VALUES IN USS: 8,500,000

Electrical Works:

Design, Supply and Installation of MVILV Distribution system and Extra Low Voltage system such as :

. MVILV Substations main and secondary distribution boards.

• MVILV Controls Cables

. Earthing and Lightning systems

• Internal and External lightings

• Security lighting

• Receptables Contactors Relays and other LV Equipments


KING ABDALLAH INTERNATIONAL CONVENTION CENTER & HOTEL IN JEDDAH(CCJ)

EXEC. TIME MONTHS: 20

CLIENT: Saudi Oger

VALUES IN USS: 52,000,000

Electrical & plumbing Works

Supply & installation of all Electrical, Plumbing & Fire Fighting works

High currencs

- MV Network

- MVILV Substations, Main and Secondary Distribution Boards

- Lightning, emergency lighting and all other services

- outdoor Lighting

- Electrical supply and protections

Mechanical

- fire fighting

MINISTRY OF MUNICIPALITY AND RURAL AFFAIRES Main Building (M.O.M.R.A)

Riyadh

EXEC. TIME MONTHS: 24

CLIENT: Cercon

VALUES IN US$: 8,000,000

Design and Technical assistance of MVILV Distribution system such os :

• High voltage Switch gear

• MVILV Substations Main and Seconday Distribution boords

• Earthing and Lightning systems

• External lighting

• Busbar Duct

. Cables

• Normal and Emergency Lighting fitting

• Public address system

KING FAHD INT'L AIRPORT(KFIA)

Dammom

EXEC. TIME MONTHS: 24

CLIENT: Mebco

VALUES IN US$: 26,500,000

Electro-Mechanical Works

Supply & installation of Electrical, Plumbing & HVAC works

Electrical

- Power Plant Generating Sets

- MVILV Substations, Main and Secondary Distribution Boards

- Earthing and Lightning System.

- Low Current Systems

Paging system, Interactive TV, MATV, Access Control, Time Attendance, Security Exit Management, CCTV, PAB, Data, Public Address, Fire Alarm, Building Management

- Indoor and Outdoor Lighting Fixtures

HVAC

- Domestic Hot Water Supply System

- Air Handling Units, FCUs, FAN's, Boilers & Steam system

- Cooling Equipment (Air Cooled Chillers)

- Carbon Monoxide Detection & Control System

PRIVATE VILLA IN YAMAMA -VILLA 6

EXEC. TIME MONTHS: 12

CLIENT: Saudi Oger

VALUES IN US$: 8,000,000

Electro-Mechanical Works

Supply & installation of all Electrical, works modifications

High Currents

- Lighting

- Power distribution

Baghdad

Al Kazimia

CLIENT: Faculty Of Medicine Ministry Of Housing Execution of 4, 000 im of ductwork

GUEST RESIDENCE IN MECCA

(Месса VIII) Месса

EXEC. TIME MONTHS: 18

CLIENT: Saudi Oger

VALUES IN US$: 5,250,000

Design, supply and Installation of :

MVILV Distribution system and extra Low voltage system such as:

. MVILV Substations main and secondary distribution boards

• Earthing and lightning systems

. External lighting

• Telephone system

• TV Distribution system

. CCTV System

. Call attendance system

. Fire alarm system

• Technical alarm system

• Security interphones

• Security sound system

. Centrolized Management Control System

BAGHDAD

CLIENT: Ministry Of Industry

Execution of electrical, mechanical & plumbing works for a 1000 person restaurant

MECCA 25- Palace-Modification

EXEC. TIME MONTHS: 5

CLIENT: Saudi Oger

VALUES IN US$: 5,000,000

Electro-Mechanical Works

Supply & installation of all Electrical, Plumbing & HVAC works modifications

High Currents

- Lighting

- Power distribution

Low Currents

- All Security and low current systems

HVAC

- Domestic Hot Water Supply System

- Air Handling Units, FCUs, FANs, Boilers & Steam system

BAGHDAD

Al Ammary

CLIENT: Amanat Baghdad

Design, supply & supervision of 2 stations 200 m3/h

Water treatment plant